Men from Krimmel Contracting Inc. working on bell tower restoration. |
|
|
|
|
|
|
|
|
|
|
|
|
Chiseling out old mortar near decorative panels. |
|
|
|
|
|
|
|
|
|
|
|
|
Pointing new mortar into joints.
(White dots are sunlight coming through deck above.) |
|
|
|
|
|
|
|
|
|
|
|
|
Corner, showing pointed and un-pointed wall section. |
|
|
|
|
|
|
|
|
|
|
|
|
Metal flashing, behind terra cotta piece, channels rain into recess at back of photo. |
|
|
|
|
|
|
|
|
|
|
|
|
3 new pieces replace the old, cracked terra cotta. |
|
|
|
|
|
|
|
|
|
|
|
|
On a different level, flashing is more easily seen. |
|
|
|
|
|
|
|
|
|
|
|
|
Finishing caulking between terra cotta and flashing. |
|
|
|
|
|
|
|
|
|
|
|
|
Several small areas of damage on terra cotta tiles. |
|
|
|
|
|
|
|
|
|
|
|
|
Damage to a larger area of terra cotta. |
|
|
|
|
|
|
|
|
|
|
|
|
Aged copper has been installed over top of terra cotta dome (below cross) |
|
|
|
|
|
|
|
|
|
|
|
|
Fabricating each piece of copper, is a tedious process. Note the waterproof layer underneath the copper. |
|
|
|
|
|
|
|
|
|
|
|
|
New copper was installed at the base of the aged copper. |
|
|
|
|
|
|
|
|
|
|
|
|
Base of cross with 2 coats of new gold paint. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
View from top of scaffolding looking East.
How many landmarks can you spot? |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
A Southerly view looking over Sacred Heart School. |
|
|
|
|
|
|
|
|
|
|
|
|
The hoist used to lift materials to the working level. |
|
|
|
|
|
|
|
|
|
|
|
|
A view of the Scaffolding from Nevin Street.
Notice the stairs used to get to the upper levels. |
|
|
|
|
|
|
|